Projects 2015
Distribution and Fulfillment Centers 2015
McCarran, NV, Building Code consulting and Code Variance for distribution center elevated storage structure, egress calculations.
Miscellaneous 2015
Lipetsk, Russia, ongoing, design criteria and specifications for fire suppression in volatile paint and coatings manufacturing facility, and hazardous waste mitigation systems.
South San Francisco, CA: Fire protection consulting on fire sprinkler system construction defects on behalf of Owners. Completed.
San Jose, CA, expert witness analysis of construction collapse and fire protection requirements for replacement structure.
Pleasant Hill, CA, annual training as fire suppression course instructor for Pleasant Hill C.E.R.T.; training of Neighborhood Watch groups with Police Department facilitator.
For U.S. National Park Service (Volunteer Engineering Work) 2015
Yosemite NP, CA, fire protection capability and risk analysis of Headquarters Administrative support facility and warehouse, El Portal.
Grand Canyon NP, AZ, analyze water hammer problems at Park’s aircraft hangar and recommend mitigation.
Glen Canyon NP, AZ, research mitigation for fire pump single phase power supply.